100 to 200 amp service upgrades
The most common call we get from homeowners adding central air, an EV charger, or a finished basement. Here is what the job involves and what it does not.
Back to Panel Upgrades and Service Changes.
What the job involves
Load calculation first, so the answer is based on your house rather than a guess. On the day, power comes off at the meter, the old panel and meter equipment come out, and the new 200 amp panel goes in. Every existing circuit gets landed on a properly sized breaker and labeled by hand on the directory card. PECO comes out to reconnect and the township inspector signs it off.
A straight 100 to 200 amp change is usually one day, with the power off for most of it.
What it does not include
It does not rewire the house. The circuits you have get landed on new breakers as they are. If the service entrance cable, the meter socket or the grounding also needs work, that adds time and cost, and you hear about it before we start, not after.
What moves the price
The condition of the meter socket, the length of the service entrance run, and the township permit fee.
I had a great experience with Dombrowski Electric. They installed a new electrical panel, added a kitchen fixture, closet lights, under cabinet lights, and new outlets. Everything was done professionally, on time, and with excellent attention to detail. The work looks great and functions perfectly. I highly recommend their services.
Rain Cloud / Panel replacement and lighting / 2026-03 · Google review
| Service | 100A to 200A panel and meter change |
| Load check | Load calculation before we quote |
| Power off | Typically most of one day |
| Permit | We pull it and meet the inspector |